Façade cladding

A golden façade with impact

Univacco Foils in Waalwijk gaat voor goud.
Univacco Foils in Waalwijk gaat voor goud.

Univacco Foils in Waalwijk is going for gold. Not only through its expertise in special foils, but now with its façade too.

Univacco Foils has grown rapidly in recent years, making a new location necessary to better accommodate its ambitions. The new premises, covering more than 7,000 m2 and located right next to the A59, feature a striking high-gloss gold façade that makes the building stand out from a great distance. The construction team, including Hercuton, EG-Projecten and Allpro BV, was jointly responsible for delivering the project.

Mischa Pouwels, project manager at Hercuton, says the project was initially drawn entirely in 2D. “It was essentially a series of separate buildings joined together. The building is quite complex because the elements all have different angles.” Hercuton then developed the entire design in 3D using BIM. “That’s how we work. This allows us to prevent rework costs and see clearly how other elements need to connect to the structure. It was ideal for the façade too.”

The building’s façades are clad in aluminium composite material (ACM) with a fire-resistant core, while the soffit elements are made from aluminium honeycomb panels.

Different materials, the same finish

The client knew exactly what they wanted: a sleek façade with impact that reflected their corporate identity. The building occupies a prominent site, and a large reflecting pool has been installed beneath the overhang at the front. The façade therefore had to have a clean appearance and, ideally, be fixed entirely with concealed fixings, including the soffit elements. To achieve this, several secondary support structures were developed to support and secure the entire construction invisibly. Jaap de Vries, Commercial Manager at Allpro, says the requirements were clear from the outset. “We had to combine products to meet the requirements. With a reflecting pool and a request for a high-gloss finish, you need something that is perfectly straight and structurally interesting.” Allpro and EG-Projecten then oversaw the process of delivering the façade.

The façade ultimately comprises approximately 575 panels, covering a total area of more than 1,800 m2 of façade and soffit elements, some measuring 4,000 mm in length.

Choosing materials and colours for the façade

Given the diversity of the project, two different types of aluminium composite material (ACM) were selected. The building’s façades are clad in ACM with a fire-retardant (FR) core, while the soffit elements are made from honeycomb panels. Both have the same coating and finish, making the difference visually imperceptible. This makes optimal use of the advantages of both materials in the construction. Wind loads, water management and other tolerances are all accommodated by the façade. The gold colour was chosen as a reference to Univacco’s special foils. The façade ultimately comprises around 575 panels, covering a total area of around 1,800 m² of façade and soffit panels.

At the rear of the building, the façade elements wrap all the way around the frame

A challenge during installation

Ed Géron, director of EG-Projecten, says they make the difference during the early stages of a project. EG-Projecten specialises in roofing and wall systems. “The earlier we are involved in the construction process, the better the end result.” The basic drawings for this façade were developed in collaboration with Allpro. “The tight tolerances in the construction and pre-production made developing the façade an enjoyable challenge. The brief for this building was to create a façade with as few visible lines as possible, and we had to take that into account.” During installation, the fitters work closely with the engineers, enabling direct communication as the façade is fitted. Installing the façade elements requires great precision. The building’s front and side façades measure 60 x 46 metres respectively. The construction tolerances in this design are difficult to accommodate, particularly with a theoretical joint width of 12 mm. The high-gloss finish is also a factor, as any imperfection would be noticeable once installed. Given the panels’ gloss level, otherwise the reflections would not be uniform. This places high demands on the fitters’ expertise, and the end result speaks for itself!  

Question about this story? Ask your question

Who worked on it

Univacco Foils site in Waalwijk

  1. clientUnivacco Foils
  2. construction teamHercuton
  3. construction teamEG-Projecten
  4. construction teamAllpro BV

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectUnivacco Foils site
  • SubjectFaçade cladding
  • CompanyUnivacco Foils
  • CompanyHercuton
  • CompanyEG-Projecten
  • CompanyAllpro BV
Share this article

Advertisement

Follow Gevelbouw

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.