Eurofast: Efficient fixing saves time and money on ventilated façades
Text Susan PeekImage Eurofast

Labour is the biggest cost on a building site. And with skilled tradespeople in short supply, it pays to take a close look at the number of steps involved in installing a ventilated façade. With the Rogger RSD® system, Eurofast combines an efficient fixing method with a project-specific calculation based on the ETA. This means the number of fixing points required for a safe and reliable anchoring solution is calculated in advance, without using unnecessary screws.
Fewer steps on site
The Rogger RSD® system was developed for the near-thermal-bridge-free installation of timber and aluminium subframes for ventilated façades. The stand-off screws have a steel core with strength class 10.9 and a glass-fibre-reinforced plastic sleeve. Their high strength means fewer fixings are needed. The battens can also be aligned and fixed in a single operation.
According to Tijn Smits of Eurofast, it is this combination that delivers benefits during installation. “Every screw you do not need is one you do not have to pre-drill for and install. Depending on the substrate, pre-drilling in particular can take a considerable amount of time.” Fewer fixing points also mean less material and less wear on drill bits. Project calculations from the past two years show that the difference in the number of screws per project can range from around 10 to as much as 50 per cent.
Calculating what is needed
Customers do not need to provide a comprehensive dossier for a project calculation. They enter the required information on a one-page A4 form, including the weight of the façade cladding, the subframe configuration, the strength of the substrate and the stand-off distance. “We have tried to make this as easy and practical as possible,” says Smits.
The calculation is based on the underlying ETA. This ensures that the anchoring is not only efficient, but demonstrably safe. The calculation prevents more fixings being used than are structurally necessary, while providing verifiable substantiation for the quantity required. “This gives the façade contractor a document to refer to during installation.”

Reliably calculated and supplied
Reliable supply is also important for working efficiently, alongside reliable fixings. The required RSD screws are generally available quickly from stock. For the Rogger range, Eurofast works with Europanel in Rijssen. “This partnership strengthens our nationwide coverage.”
Smits emphasises that Eurofast and Europanel are also happy to visit site to explain and demonstrate the system. “We want customers to know how to use it and to be confident that the system is being installed correctly.”
Een zakelijke vraag aan Eurofast? Get in touch
Companies in this story
Keep following this
Get an email when a new story is published. No account needed.
- ThemeFacade design and construction
- SubjectProduct information
- CompanyEurofast
















