Façade cladding

A striking extension for Museum W

TECU Gold is een koperlegering waaraan wat zink is toegevoegd zodat het materiaal wat stijver wordt.
TECU Gold is een koperlegering waaraan wat zink is toegevoegd zodat het materiaal wat stijver wordt.

The municipal museum in Weert has undergone a thorough renovation and redesign. The listed building now features a striking gold-coloured façade in TECU Gold copper alloy. A perfect fit for Ridder Skins for Buildings. 

The listed building now features a striking gold-coloured façade in TECU Gold copper alloy.

Since 3 May this year, the municipal museum in Weert has once again been open to the public, following an extensive renovation, restoration and redesign. Now known as Museum W, it has embarked on a new curatorial direction, with a refreshed presentation of its permanent collection and an exhibition programme featuring contemporary art and design. The design of the new façade, interior and fit-out is by Limburg-based designer Maurice Mentjens. Ridder Skins for Buildings, a specialist in metal roofing and façade systems, was brought in to ensure the TECU Gold copper alloy was processed correctly.

For the interior cladding, Ridder Skins for Buildings developed a bespoke profile.

Patina

TECU Gold is a German product made by KME. “It is a copper alloy with some zinc added to make the material a little stiffer,” says Dennis Reek of Ridder Skins for Buildings. “The great thing is that the product retains its distinctive colour, although over time the patina will develop slightly and the sheen will diminish somewhat, but only minimally. We used around 360 m2 of TECU Gold on the project. The façade is finished in a plank profile, a modular system of folded ‘planks’ that slide together and can be installed as relatively flat façade cladding. We also clad seven façade shutters with the system and used folded sheet in the same copper alloy, but 0.70 mm thick, for various reveals, the entrance, the interior façade of the reception area and a number of display cases. For the interior cladding, the architect had devised a bespoke profile, which we developed together, with a very pleasing result.”

Surreal

KME manufactures TECU Gold on coils weighing around 1,000 kilograms. “At our production site in Zwaag, the material was cut to size on a CNC slitting machine and then folded on all four sides to form modules in the specified plank profile,” explains Reek. “In Weert, our installers mounted the prefabricated modules on timber battens using steel angle brackets. A (small) proportion of the modules features a perforated pattern. These were mounted on a coated aluminium substructure. The end result is impressive, almost surreal in the heart of Weert. The façade really stands out among the historic buildings. The architect went to great lengths to achieve the desired materialisation, and succeeded. It is an excellent reference project for us too. We have been doing this work for more than 35 years, but we are still honoured to work with such beautiful materials. It is pure craftsmanship. And when a project finally emerges from the scaffolding, it really is a gift.”

Question about this story? Ask your question

Who worked on it

Museum W in Weert, renovatie

  1. claddingRidder Skins for Buildings

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectMuseum W
  • SubjectFaçade cladding
  • CompanyRidder Skins for Buildings
Share this article

Advertisement

Follow Gevelbouw

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.