Façade cladding

Corda Campus, Hasselt | Architecture and nature merge at Corda Campus, with the glass façade as a striking feature

Corda Campus, Hasselt | Architecture and nature merge at Corda Campus, with the glass façade as a striking feature

Now that Corda Campus in Hasselt has been completed, it is finally possible to see just how beautifully architecture and landscape come together. That was exactly the idea behind Architectenbureau ELD’s design. The combination of the two steeply sloping green roofs and the two fully glazed façades is particularly striking. The energy-efficient building, whose roof also provides thermal insulation and collects rainwater, stands on the former Philips site in Hasselt.

Unparalleled beauty

Several types of façade were used to achieve the distinctive appearance envisaged by the architect. The sustainable aluminium exterior finish of the glazed façades was supplied by Aliplast Aluminium Systems, one of the leading players in the international market for the development of aluminium systems. Aliplast took a coordinating and facilitative role in the engineering and various technical matters, bringing the parties together. “We used our MC-Wall as the curtain wall profile,” says Marc Mulders, sales manager Netherlands at Aliplast. “This curtain wall allows natural light into the building and prevents wind and water ingress. It has an outstanding appearance and is ideal for constructing modern semi-structural façades of this kind. It fits perfectly with the architect’s aesthetic vision and also meets the long service life expected of buildings like these.”

For an even more attractive appearance, the curtain wall cover cap was finished in black and fitted with a white strip.

Performance

The Aliplast MC-Wall curtain wall system is used for both simple and complex designs, and for traditional and semi-structural façades. Mulders explains that, on this particular project, the main considerations related to the type of glazing. This was due to the integration of shadow boxes, different glass thicknesses, wind and water load requirements, installation in open and closed sections of the façade, fire spread, and the alignment and connection of the façade cladding. “As a systems supplier, we often know the project and site details, construction schedules and technical requirements for façades like these at an early stage. Our MC-Wall system allows for spans, making it possible to create large spans and continuous glazed structures.   

It is therefore perfect for tall office complexes such as Corda Campus. Take our maximum Ix of 4437.41, for example, which makes it possible to build a curtain wall in ‘wind area two’ without additional coupling.” Mulders adds: “This means that glass panels 8.5 metres high and 2.5 metres wide, supported at two points, at the top and bottom, are possible. Our vertical mullions reach 326 mm. This gives us a higher Ix than two of the three other major players in the Benelux. These are standard range profiles, not project-specific solutions.” The MC-Wall has passive certification from IFT Rosenheim, and its fire-resistance ratings are EW60 and EI60. The innovative Aliplast Star75 series was used in the other building block at Corda Campus, partly because of its excellent wind and watertightness, which comfortably exceeds the relevant standards, and its high thermal performance, which has ranked among the best on the market for years.

The innovative Aliplast Star75 series was used in the other building block at Corda Campus.

Long-term warranty

The profiles received an electrostatic powder coating in accordance with the Qualicoat Seaside standard. Asked why Aliplast can offer a long-term warranty on all its profiles, Mulders replies: “Our standard pre-treatment is Qualicoat Seaside, which means 2 g/m² of pickling, compared with standard Qualicoat, which specifies just 1 g/m². Since every stage of the extrusion and coating processes is carried out in-house, we have full quality control and offer a 15-year colour warranty on the coating. We also offer a range of 45 contemporary colours with a 25-year warranty. These undergo an even more stringent powder-coating process and meet the Qualicoat Class II quality standard.” Mulders concludes: “On a special project like this, it is a real advantage to know that colour retention is guaranteed from an aesthetic point of view.”

A business enquiry for Aliplast? Get in touch

Who worked on it

Corda Campus in Zwartewaterland

  1. vliesgevelprofielAliplast
  2. architectArchitectenbureau ELD

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectCorda Campus
  • ThemeGlass for light and comfort
  • SubjectFaçade cladding
  • CompanyAliplast
  • CompanyArchitectenbureau ELD
Share this article

Advertisement

Follow Gevelbouw

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.