Light-filled, transparent headquarters brimming with sustainable innovations

A range of innovations has been incorporated into the design and construction of ING’s headquarters in Amsterdam-Zuidoost. The ‘Cedar’ building is therefore a seamless fit with the concept behind Cumulus Park.
ING is developing this innovation centre in partnership with knowledge partners and the municipality of Amsterdam. Innovation is reflected not only in the building’s transparent structure, but also in its sustainability ambitions. The extensive use of aluminium and glass is particularly striking.

One of the most distinctive features of the new ING headquarters is the amount of natural light it admits. This makes the importance of transparency in the design quite literally visible. The aim was to create a façade characterised by repetition. The building’s transparency is emphasised by using a large glazed area, incorporating curved corners and keeping the aluminium profiles as discreet as possible. This also meets the architect’s aesthetic preferences.
An optimal working environment
When the building was designed, views on the office environment were very different from what they are today. The architects could not, of course, have foreseen that developments over the past year would bring about a major shift in this respect. More and more organisations are now moving towards hybrid workplaces, with employees switching flexibly between working in the office and at home. It remains to be seen how this will work in practice.


Leaving aside these social developments, the design of the new headquarters undoubtedly supports working in a healthy environment. Research shows that employees feel more energised when they spend time in a workplace with plenty of natural light. Daylight promotes the production of serotonin, a neurotransmitter that helps people feel calmer and more content. Serotonin also suppresses emotions such as fear and aggression. By allowing plenty of daylight into the Cedar building, the façade therefore contributes to the health and wellbeing of ING’s staff. Just as importantly, it creates a pleasant working environment.

The client also set a number of technical requirements. The curtain wall, for example, had to provide a high level of insulation and a low thermal transmittance. This was achieved using triple glazing and profiles designed to deliver optimum insulation. Other requirements were also set for the façade design. The finished façade is fully wind- and watertight, sound-insulating and ‘fall-safe’, helping to prevent injury.
Delivering bespoke solutions
The repetitive nature of the façade made it possible to use prefabricated elements. The curtain wall units were developed specifically for the Cedar building, allowing them to be easily fitted to the anchors already installed and positioned. This approach enabled a bespoke solution, with precise dimensions for production, transport and installation.

With this in mind, Kawneer and its partners opted for unitised elements with coupling profiles. Another striking feature is the vertical profiling, for which an exceptionally flat pressure plate was developed, projecting just a few millimetres over the glass. These are just a few examples of the many innovative bespoke solutions used on the project.
Sustainability ambitions
A project as ambitious as this, with innovation and future-proofing at its heart on every front, calls for a strong sustainability commitment. The Dutch financial sector is taking a leading role in meeting the targets set out in the Climate Act. For example, financing decisions take a project’s CO₂ footprint into account, while banks also have targets for reducing their own environmental impact. Accordingly, explicit choices were made on sustainability and circular construction when the new ING office was built. The most significant was the aluminium used in the façade. The Kawneers AA 100 HI+ curtain wall system selected for the project holds Cradle to Cradle Silver certification. Another choice driven in part by sustainability ambitions was the AR 100 programme. It offers the same quality and corrosion resistance as standard aluminium, but its raw material consists of 80 per cent recycled content. As a large number of profiles were used, choosing AR 100 made a significant contribution to the project’s sustainability rating. This helped make it the first building in the Netherlands to receive a BREEAM-NL Outstanding certificate. The rating is a good match for ING’s culture and ambitions.
Question about this story? Ask your question
Who worked on it
Cedar in Amsterdam
- clientING
- curtain wall systemKawneer
Keep following this
Get an email when a new story is published. No account needed.
- ProjectCedar
- SubjectGeneral
- CompanyING