Modular profile system for an earthquake-resistant high-rise apartment block

Building in the Netherlands is undergoing irreversible change. This calls for new construction methods. In a relatively traditional sector, we are seeing that changes of this kind are necessary to optimise process control, construction costs and lead times.
Intal is the ideal construction partner for aluminium windows and curtain walls.
From design to extrusion, and from production to installation, Intal manages the entire production process in-house. This means it can offer not only the high quality required, but also the speed and reliability that ensure an efficient workflow.

The Intal IT77 profile, inward-opening and with double glazing, as used in the Duindoornflat in Groningen.
Scaffold-free construction
Developments in society and new technological possibilities are changing the challenges facing our sector. Intal is keen to put its expertise to work as a partner, helping to find the most suitable solution. Johan Andringa of Intal says: “Scaffold-free construction is a prime example of an approach that is gaining ground, but which we at Intal have been working with for much longer. Demand for modular construction is growing, particularly in urban areas and where space is limited, and scaffold-free construction is an offshoot of this. By supplying our IT77 windows as prefabricated units wherever possible, the risk of errors and associated costs is greatly reduced, as the connections have been tested and kept to a minimum. The product is also installed to best effect, and the construction schedule is considerably shorter, which is also beneficial when it comes to potential disruption for local residents. It definitely gives you better control over the process!”
Duindoornflat, Groningen
“The Duindoornflat in Groningen is a perfect example of a fantastic upgrade to the existing housing stock,” Andringa continues. An outdated apartment block has been turned into a new residential development on behalf of housing association Woningcorporatie Lefier. The structure was not demolished, and existing materials were reused wherever possible. The block had to be extended to meet residents’ contemporary needs, as well as being made earthquake-resistant and gas-free. “Add the relatively limited space on site, and you know you have to be inventive. We became involved early in the engineering process. We have always enjoyed excellent collaboration with our regular partner and contractor, Van Wijnen. We drew on our expertise to help determine the right connections and how the façade elements could be installed easily and efficiently. Transport was another consideration. There is a whole range of factors to take into account when building in a slightly different way. It is worth mentioning that good process control and the delivery of prefabricated façade elements in the correct order left the architect, AAS architecten, time to work with Intal on creating a unique façade. Each residential unit has its own sandblasted pane, featuring an image incorporating the house number.”

A unique façade has been created, with each residential unit featuring its own sandblasted pane that incorporates an image of the house number. It also creates a striking effect after dark.
In-house system
“We may be a relatively young company, but we consistently set ourselves apart in our own distinctive way. That is only possible with an open culture and structure, both internally and
externally. Our own Intaltherm profile system is a good example of this. We also carry out all our work in a 3D BIM environment, which makes us the complete and
ideal partner for large-scale projects.” Andringa is convinced that much more is possible in the Netherlands: “As long as we keep developing and focusing on relatively new construction methods that offer significant benefits to all parties. The success of Intal’s approach is clear from the fact that this project is set to continue. Van Wijnen has also awarded us the contract for the Esdoornflat, where we can once again put our many years of experience in prefabricated and modular construction to work as system supplier.”
A business enquiry for Intal? Get in touch
Who worked on it
Duindoornflat in Groningen
- contractorVan Wijnen
- architectAAS architecten
Keep following this
Get an email when a new story is published. No account needed.
- ProjectDuindoornflat
- SubjectGeneral
- CompanyVan Wijnen
- CompanyAAS architecten
- CompanyIntal















