General

nhow Amsterdam | Massive anodising project

nhow Amsterdam | Massive anodising project

With 650 rooms across 25 floors, the four-star nhow Amsterdam RAI hotel will be the largest newly built hotel in the Benelux. The ‘triangular’ design of the 91-metre-high hotel tower is based on the advertising column dating from the 1960s on the forecourt of the RAI complex. Special attention has been paid to the vertical articulation of the façade, made up of no fewer than 4,000 (!) natural anodised fin profiles, alternating between matt and polished finishes.

According to the client, modern art, design, gastronomy and culture go hand in hand at the new RAI hotel. The design is by the world-renowned Dutch architecture firm OMA, also responsible for De Rotterdam. The hotel is a new social and multicultural meeting place for business travellers, tourists and Amsterdammers, and boasts unusual facilities such as a television studio, a sky bar, a gallery, a sculpture garden and a spa. At an early stage, façade contractor Rollecate approached Alucol to identify ways of optimising the fin profiles that emphasise the vertical articulation of the façade

Massive anodising surface area

The fin profiles are enormous, says Ramon van Dongen of Alucol. “The profile has a perimeter of almost 900 millimetres. Two are joined together each time to create the intended façade appearance, resulting in a large V-shaped element. The total anodising surface area is no less than 37,000 m2. Given the scale, we carefully mapped out the logistical flows at an early stage. We handled the entire anodising process for Rollecate, including polishing, which was outsourced to a regular partner. Optimising the internal logistics to and from the pre-treatment specialist (polishing), including weekly requirements, volume flows and so on, was therefore also an important aspect of the project as a whole.” The new hotel is located next to the RAI complex, in the triangle between Europaboulevard, the A10 and the RAI. “Because it is right next to the motorway, an anodised layer thickness of 25 um was chosen, 5 um more than the standard specified for façade construction in the Netherlands.” The new nhow Amsterdam RAI will open its doors in the first quarter of 2020.  

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectGeneral
Share this article

Advertisement

Follow Gevelbouw

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.