Versatile and flexible modular scaffolding system

Several earthquake-resistant homes are being built in phases in the centre of Groningen as part of the Ebbingekwartier development. One of them is Ebbingehof, a small-scale, sustainable residential building for over-50s, with 40 apartments and several shared facilities and communal spaces. The PERI UP Flex modular scaffolding system is being used during construction.

Safety first
Commissioned by Trebbe Bouw, Stalen Steigers van Dorland (SSvD) is responsible for erecting and dismantling the PERI scaffolding and concrete shoring for the new Ebbingekwartier development. “The scaffolding system has created a safe working environment for the people working on this project. One challenge was that there is only one right-angle corner in the entire building. This calls for flexibility in both the structure and the scaffolders. Our PERI UP Flex modular system is ideally suited to this,” says Remko Perre, Commercial Projectmanager BeNeLux. The system is used as an elevated working platform and as edge protection during the structural phase. The façade panels are installed from these level working platforms, providing optimum safety without trip hazards.

Robust and reliable
The contractor, scaffolder and users on this project are all enthusiastic. Perre says: “They are particularly impressed by the sturdiness of the PERI UP Flex scaffolding system. Thanks to the integrated locking mechanism, the steel decks sit securely in place. They cannot rattle or warp, so they do not pose a hazard to the hard-working people on site.”
A versatile scaffolding system
This versatile system also provides a solution when it comes to safety during other phases of construction. Perre says: “For this project, it was decided to lower the window frames from the top down. This does mean that one deck has to be removed, but the scaffold still meets the fall-through requirements. An aluminium, lightweight PERI UP stair tower has been installed alongside the ladder access points to provide safe access to the scaffold. An observation platform has also been installed on this project, allowing potential buyers and other interested parties to view the construction work safely.”
Easy to erect
As well as being safe and flexible, the robust system is easy to erect, helping to shorten the project schedule. Scaffolder SSvD is happy to work with PERI systems. “The fixed dimensions of this ingenious system are particularly practical and provide the certainty we need,” we are told. “Challenges are quickly turned into solutions because PERI can provide a complete package covering engineering, design and materials.” The limited space on site meant that just-in-time deliveries were essential for this project. “Clear communication enables us to work efficiently and cost-effectively. This creates a strong partnership and leads to a great end result,” Perre concludes.
Question about this story? Ask your question
Who worked on it
Ebbingehof in Groningen
- scaffolding contractorStalen Steigers van Dorland (SSvD)
- steigersysteemPERI
Keep following this
Get an email when a new story is published. No account needed.
- ProjectEbbingehof
- SubjectProduct information
- CompanyStalen Steigers van Dorland (SSvD)
- CompanyPERI