Façade cladding

Timber high-rise

Timber high-rise

Top-Up in Amsterdam is an exceptional project in many respects. The seven-storey building is largely made of timber, with a solid spruce load-bearing structure, pine frames and open cladding in Siberian larch. Foreco houtconstructies was brought in to deliver the complete external envelope, from the inner leaf of the cavity wall through to the aesthetic finish. We spoke to Hans van den Heuvel of Foreco about the façade build-up and the deliberate decision not to prefabricate the cladding.

Following positive experiences on previous projects, contractor Hillen & Roosen approached Foreco at an early stage. “Our scope covered the complete façade finish, including the substructure, insulation, fire-retardant membrane, battens and visible façade elements,” says Van den Heuvel. “We were also responsible for constructing the ceilings in the 28 live-work lofts, as well as the decking and terrace floors. All were made from Siberian larch. It was a sizeable job, but one that suited us down to the ground. We were able to demonstrate our added value particularly with the open cladding.”

Foreco houtconstructies was brought in to deliver the complete external envelope, from the inner leaf of the cavity wall through to the aesthetic finish.

Façade specialists

Foreco has its own department specialising in timber cladding. “With our extensive range of timber cladding, which includes a wide variety of profiles and fixing methods, we can provide a suitable solution for every project,” says Van den Heuvel. “For Top-Up, the façade finish consists of finely sawn timber boards, 18 by 68 millimetres, in varying lengths. The boards are face-nailed to timber battens using stainless steel nails, with a 10-millimetre gap between each board. They have been treated with FRX for fire retardancy and meet Euroclass B under the Dutch Building Decree. They have also been pre-weathered grey using a special treatment, so the façade will weather evenly, regardless of whether it is on the sunny or shaded side. This makes the natural greying of the larch less noticeable.”

The open cladding was made entirely on site.

Cutting to length and installation

The open cladding was made entirely on site. According to Van den Heuvel, prefabrication offered no benefits on this project. “The boards arrived fully pre-treated and were cut to length on site. The end grain was then impregnated on site. A major advantage of cutting and installing the boards on site is that we can easily accommodate minor irregularities in the substructure. For installation, we used the contractor’s scaffold, which was dismantled from the top down after our work was complete. We spent around four months installing the cladding. In parallel, we completed the other timber structures in Siberian larch, which were also impregnated for fire retardancy but not pre-weathered.”

The first residents have now moved into Top-Up. The lofts were handed over as shells, with buyers responsible for their own apartment layouts and finishes.    

Question about this story? Ask your question

Who worked on it

Top-Up in Amsterdam

  1. façade finishingForeco houtconstructies
  2. contractorHillen & Roosen

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectTop-Up
  • ThemeFacade design and construction
  • SubjectFaçade cladding
  • CompanyForeco houtconstructies
  • CompanyHillen & Roosen