A complete solution for façade insulation and renovation

Thermally upgrading the existing building stock is more relevant than ever. With Isofinish®, this can be done without major disruption. Building owners also benefit immediately from an aesthetic upgrade. The complete solution for façade insulation and renovation has also proved a popular system for new-build projects.

With Powerwall®, Recticel Insulation has brought a unique product to market that makes it possible to retrofit-insulate the external walls of existing buildings efficiently and responsibly. “The concept forms the basis of the Isofinish® renovation method, together with Borgh’s fixings,” says Benedikt van Roosmalen of Recticel Insulation. “There is then considerable freedom to choose a façade finishing supplier, including Eternit, Deceuninck, RockPanel and Trespa. Isofinish® is therefore also a very interesting product for architects. A major advantage is that the additional weight of the new ‘skin’ is usually limited, so renovation projects do not require any changes to the foundations.”

Continuous layer of insulation
According to Van Roosmalen, retrofitting insulation boards between timber battens is now well and truly outdated. “With Isofinish®, we create a continuous layer of insulation, as the Powerwall® insulation boards are fixed directly to the outer leaf. The unique tongue-and-groove click system makes the risk of energy loss negligible. The single-layer timber battens are then fixed and aligned in one operation in front of our insulation boards, using Borgh’s special anchoring method. The method uses both horizontal screws, to bridge the distance, and diagonally inserted screws, to support the weight of the aesthetic outer layer. Unlike other concepts, which are based on the worst-case scenario as standard, the number of anchors required for Isofinish® is determined according to the type of façade finish. This means that no more material is used than is practical and necessary, while the number of drilled holes is also kept to a minimum. We are confident that, compared with any other system, this is the fastest to install while making optimum use of the materials required. A real win-win for the client, installer and the environment.”
Kiwa Apeldoorn
Isofinish® requires a façade finish with a minimum fire classification of B or a stone-like material to meet the ‘end use application’ requirements. “Companies using Isofinish for the first time receive on-site support at the start of a project. This additional service is completely free of charge,” says Van Roosmalen. “Our service goes well beyond that. If there are any doubts about the load-bearing capacity of the substrate, the existing external wall, we always carry out additional investigations. These also take into account the bond between the inner and outer leaves, which is improved where necessary. After that, it is simply a matter of insulating and installing the finish.” One of the recent projects to use Isofinish® was the refurbishment of Kiwa’s office in Apeldoorn. Thanks to Isofinish®, the building has received both a thermal and an aesthetic upgrade. “In a short time, the old concrete behemoth has been transformed into a fresh, modern building that once again meets all the requirements and looks as good as new.”
Een zakelijke vraag aan Isofinish? Get in touch
Companies in this story
Keep following this
Get an email when a new story is published. No account needed.
- ThemeAn energy-efficient and comfortable building envelope
- SubjectGeneral
- CompanyIsofinish
- CompanyRecticel Insulation