Spectacular fires in high-rise buildings over the past decade prompted governments and stakeholders (contractors, manufacturers, suppliers and others) in Europe and beyond to undertake a thorough review of the fire regulations in force.

The high death toll and extensive material damage caused by the devastating fire at London’s Grenfell Tower in 2017 accelerated this process.

By that time, the ‘Facades’ working group, set up within the Belgian High Council for Fire and Explosion Safety, had already drawn up a number of proposals to amend the regulations. The document was approved during 2019. The Royal Decree is expected to be published in the Belgian Official Gazette in autumn 2021, with a view to it coming into force on 1 July 2022. However, several fire brigades are already applying a number of the proposed amendments as a code of good practice.

At the fire resistance themed evening organised by the Federation of Aluminium Contractors (www.fac-belgium.eu) on 2 February, Sven Eeckhout, Senior Project Leader in the Acoustics, Facades and Joinery Department at WTCB, outlined the forthcoming new Belgian regulations on façade fire safety. 

New fire safety requirements for façades

The fire safety regulations set out in the Royal Decree of 12 July 2012 on the ‘Basic Standards for the Prevention of Fire and Explosion’ (Annex (5/1)) are based on the European reaction-to-fire classification, which indicates how a material contributes to the spread of fire. Materials in classes A1 and A2 are non-combustible, while class F materials are highly combustible. Smoke production (class S) and flaming droplets (class D) are also covered by this classification: a virtually non-combustible product that produces a lot of smoke will receive a poorer rating (that is, a higher number or letter in the scale).

The existing regulations set no reaction-to-fire classification requirements for industrial buildings. For low-rise buildings (h < 10m), class D-s3, d1 applies, and for medium-rise and high-rise buildings, class B-s3, d1 applies.

The revised regulations introduce stricter requirements for fire spread over the façade surface, particularly for high-rise buildings, where materials will have to be non-combustible. The requirements for the essential components of the façade system are entirely new. Both the reaction-to-fire requirements for the façade cladding (Table A) and those for the façade components (Table B) will have to be met.

As regards the reaction-to-fire class of the façade cladding (Table A), the new regulations distinguish between three types of occupants in low-rise buildings. For low-rise buildings occupied by people who cannot evacuate independently (e.g. residential care centres), the requirement is tightened to class C-s3, d1. There are no changes for low-rise buildings occupied by people able to evacuate independently. The requirements for medium-rise buildings are also unchanged. For high-rise buildings, however, the new regulations require the façade cladding to be non-combustible in ‘end-use conditions’, which will clearly have a significant impact on the choice of materials.

The reaction-to-fire requirements for essential components (Table B) depend on the height of the building and on whether or not the components can be fully protected against fire. Requirements apply to essential components in every situation. In medium-rise and high-rise buildings, façade components must be non-combustible. If combustible components are used in the façade (reaction-to-fire class E or better), a standard solution must be chosen and/or the façade components must be fully protected against fire, both from inside and outside. This means that the components must be enclosed on all sides. In high-rise buildings, this protection must consist of an element with fire protection performance K2 30 or fire resistance EI 30; in medium-rise buildings, it must consist of an element with fire protection performance K2 10 or fire resistance EI 15. 

The requirements in the table do not apply if a successful ‘large scale’ test report can be submitted. As there is no overarching European test method or Belgian ‘large scale test’ available, the authorities have chosen to accept British BS, German DIN and French LEPIR tests, together with their associated performance criteria. 

Fire spread between compartments: no new requirements

The measures set out in the Basic Standards Royal Decree (§3.5 of the ‘Basic Standards’ Royal Decree, Annexes 2/1, 3/1 and 4/1) to prevent or delay vertical or horizontal fire spread between two compartments via the façade remain unchanged. 

These state that the curtain wall frame must be anchored at each floor level with a fire resistance of 60 minutes, unless the building is fitted with a sprinkler system. The position of the fixing anchors (beneath the floor slab, against its side or above it) determines what additional protection is required to meet this requirement. 

To prevent fire spreading along the inside, between the compartment floor and the façade element,
EI performance (integrity and thermal insulation) is required for 60 minutes in all types of buildings. 

To prevent fire spreading along the outside between two compartments, the façade element must provide a degree of fire resistance at each compartment wall (e.g. floor slab). There are no requirements in this regard for low-rise buildings (≤ 10 m). However, it is important to note that the federal requirements set out in the ‘Basic Standards’ Royal Decree may be supplemented by specific rules introduced by the communities and regions. 

There are four options for limiting external fire spread in medium-rise or high-rise buildings: 

  • the most common solution is a vertical flame barrier E60 with a minimum developed length of 1 m; an alternative is a horizontal projection with integrity E 60 and a length of 60 cm;
  • a second option is to install a façade with ‘inside outside’ integrity E 30 over the full height of the building, for example using
    fire-resistant glass;
  • the third option is to install a façade with integrity E 60 at every other floor level;
  • finally, all compartments adjacent to the façade can be fitted with an automatic sprinkler system.

Practical guide to a fire-safe façade 

During 2021, WTCB plans to publish a Technical Information document providing answers to the many questions raised by aluminium contractors and builders about façade fire safety and the correct installation of the flame barrier. The document was prepared by a working group comprising contractors, FAC members and partners, FOD BiZa, ISIB, designers, inspection bodies and others.

The publication covers legislation, testing and classification systems, and design and installation guidelines, including standard technical solutions for the flame barrier.

Want to keep up to date with publications and further developments in fire safety? Visit www.wtcb.be

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeSafe and verifiable facade construction
  • SubjectGeneral
Share this article

Advertisement

Follow Gevelbouw

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.