General

A more efficient journey from design to production

Text Roel van GilsImage Metaalbouw TSV

Het nieuwe gevelsysteem bestaat uit een Omega-profiel dat dwars door de bestaande gevel wordt verankerd aan het HSB-binnenspouwblad. Hieraan worden de gevelcassettes bevestigd.
Het nieuwe gevelsysteem bestaat uit een Omega-profiel dat dwars door de bestaande gevel wordt verankerd aan het HSB-binnenspouwblad. Hieraan worden de gevelcassettes bevestigd.

A smart façade solution for Alfa-college

Alfa-college in Groningen was facing serious safety issues. The bonded façade tiles have been coming loose since 2015. As an emergency measure, safety nets were installed to prevent passers-by from being struck by falling debris. Metaalbouw TSV is now working on a future-proof solution that will effectively wrap the façade in aluminium composite cassettes. For the engineering of this new façade system, the team made grateful use of HiCAD, which made it possible to speed up and simplify the transition from design to production considerably.

The biggest challenge came at the start of the project, explains Aron Strengholt of Metaalbouw TSV. “Together with contractor Jorritsma and Aas Architecten, we looked for an aesthetically sound solution that would not only be safe, but also efficient to produce and install. However, the existing façade is not to be touched. So if the original façade tiles were to come completely loose in the future, the new cassette construction would have to be able to withstand that load.”

Parametric design

The new façade system consists of an Omega profile anchored through the existing façade to the timber-frame inner leaf. The façade cassettes are attached to it. “The components are milled from flat aluminium composite sheets, folded and assembled into complete façade cassettes with integrated fixing profiles,” explains Strengholt. The cassettes vary in size, but are fundamentally identical and feature a subtle bend to create a more dynamic façade. “The great thing about HiCAD is that we can build the entire façade parametrically from the very first design file and link it directly to our production machinery,” says engineer Kevin Kartodirijo.

To avoid repetition in the façade pattern, the patterns are subtly offset from top left to bottom right. This layout was also developed in 3D in HiCAD.

Continuous optimisation

Where several software packages and handover stages would normally be required, everything here stays within a single software system. Strengholt: “This prevents differences in interpretation, minimises the cost of errors and makes rapid optimisation possible, even during installation. During assembly, for example, we found that a particular lip did not quite fit as well as it could. We redesigned the detail straight away in the HiCAD source file, tested it in production and then automatically applied the change across the entire façade. This also updated the information sent to the machines in the folding shop. HiCAD modules such as Profile Installation and Alucobond make engineering much easier. From design to work preparation and production, it’s all included.”

Installation numbering

The façade is divided into sections, each with its own pattern. “To avoid repetition in the façade pattern, the patterns are subtly offset from top left to bottom right. This layout was also developed in 3D in HiCAD, including the numbering of all installation positions. The complete cassettes are then transported to site in crates, where our installation teams fit them one after another, like a little train, onto the supporting structure of Omega profiles. Because the production and installation drawings are generated from the same digital model, the components fit together exactly. The screw connections are tested on site for each façade section to ensure that the supporting structure has sufficient load-bearing capacity.”

Metaalbouw TSV began installation on site at the end of November last year. The work is being carried out in phases and is expected to continue until the end of 2026. The project shows how engineering with integrated software such as HiCAD can make the transition from design to production much more efficient.

‎‎

A business enquiry for ISD Group? Get in touch

Who worked on it

Alfa-college in Groningen

  1. contractorJorritsma
  2. architectAas Architecten

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectAlfa-college
  • ThemeFacade design and construction
  • SubjectGeneral
  • CompanyJorritsma
  • CompanyAas Architecten
  • CompanyISD Group
Share this article

Advertisement

Follow Gevelbouw

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.