New RIVM and CBG buildings: a major project for Belgian corrosion protection specialist

The finishing touches are being put to the Netherlands’ most sustainable government building at Utrecht Science Park, which has been awarded a BREEAM Outstanding design certificate. The 80-metre-high tower, with its offices and laboratories, will become the new home of the National Institute for Public Health and the Environment (RIVM) and the Medicines Evaluation Board (CBG) agency from the end of this year. Belgian family business Tilkin Powder Coatings was brought in to protect the robust steel structures against corrosion. A major project.

The new RIVM/CBG building is sustainable in many respects. Its robust structural design, column-free work areas, generous floor-to-ceiling heights, flexible layout and selected building services systems, energy generation and equipment all help to make it future-proof. The building’s cooling and heating are energy-neutral, with as much of the energy required as possible generated locally from sustainable sources. This means that cooling, heating and lighting produce no CO2 emissions. “Our far-reaching commitment to sustainable business practices is a perfect match for the sustainability ambitions of the RIVM/CBG building,” says Jo Tilkin, director of Tilkin Powder Coatings. “We aim to keep our carbon footprint as low as possible. That makes powder coating one of the most environmentally friendly treatments available today.”


The Benelux’s largest curing oven
Tilkin Powder Coatings has the largest curing oven in the Benelux. “We can cure structures measuring up to 18 metres long, 3.6 metres high and 3.7 metres wide, with a maximum weight of 10 tonnes,” says Tilkin enthusiastically. He also shares that enthusiasm and passion with his experienced employees. “Together, we are able to deliver and guarantee consistently high quality every day. We work exclusively with high-quality raw materials and qualified staff, and in 2015 we became the first steel corrosion protection company in Europe to obtain EN1090 certification, doing so in just four months. We were therefore able to provide the necessary guarantees for the corrosion protection of the steel structures in the new RIVM/CBG building without hesitation. This was made possible by our standard integrated quality control system.”

Prestigious project
Tilkin Powder Coatings in Tongeren spent more than eight months working around the clock to protect the steel frames against corrosion. Tilkin says: “The project ultimately involved more than a hundred (!) abnormal-load transport consignments because of the dimensions involved. It was a major project for us too, but our huge production capacity and ability to scale it up (24/7) meant we could ‘simply’ schedule the work alongside our regular orders, which also continued as normal. On a project of this scale, everything has to be right. We know better than most how to manage that. Courage and drive, as well as expertise, quality and flexibility, are in our DNA. We are proud to have contributed to such a prestigious project as a Belgian family business.”
Question about this story? Ask your question
Who worked on RIVM/CBG-gebouw
Keep following this
Get an email when a new story is published. No account needed.
- ProjectRIVM/CBG building
- SubjectProduct information















