An 80-metre-high glass tower with eighteen storeys of offices and laboratories is rising at Utrecht Science Park. It will become the new home of the Rijksinstituut voor Volksgezondheid en Milieu (RIVM) and the agency of the College ter Beoordeling van Geneesmiddelen (CBG). Belgian family-owned company Tilkin Powder Coatings was brought in to protect the robust steel structures of the Netherlands’ most sustainable government building, which has a BREEAM Outstanding design certificate. A look back at this major project with managing director Jo Tilkin.

The new RIVM/CBG building is sustainable in many respects. It is future-proof thanks to its robust structural design, column-free work areas, generous floor-to-ceiling height, flexible layout and selected building services systems, energy generation and equipment. The building’s cooling and heating are energy-neutral, with the required energy generated locally from sustainable sources wherever possible. As a result, cooling, heating and lighting produce no CO2 emissions. “Our deeply rooted commitment to sustainable business aligns perfectly with the sustainability ambitions of the RIVM/CBG building,” says Tilkin. “We aim to keep our carbon footprint as low as possible. This makes powder coating one of the most environmentally friendly treatments currently available.”
Tilkin Powder Coatings has the largest curing oven in the Benelux. “We can cure structures measuring up to 18 metres long, 3.6 metres high and 3.7 metres wide, weighing up to 10 tonnes,” says Tilkin enthusiastically. He also shares that enthusiasm and passion with his experienced employees. “Together, we are able to deliver and guarantee exceptionally high quality every day. We work exclusively with high-quality raw materials and qualified staff, and in 2015 we became the first steel protection company in Europe to obtain EN1090 certification, achieving it in just four months. We were therefore able to provide the necessary guarantees for the protection of the steel structures of the new RIVM/CBG building without hesitation. That was made possible by our standard integrated quality control system.”

At the end of January 2020, the first steel frames for the new RIVM/CBG building arrived at Tilkin Powder Coatings in Tongeren. “We worked around the clock on the protective treatment until the end of October that year, to be precise,” Tilkin continues. “In the end, the project required more than one hundred (!) exceptional-load transport trips because of the dimensions involved. It was a major project for us too, but thanks to our huge production capacity and our ability to scale it up (24/7), we were able to fit the project in ‘as usual’ alongside our regular orders, which also continued. On a project this large, everything has to be right. We know better than anyone how to manage that. Courage and drive, as well as expertise, quality and flexibility, are in our DNA. We are proud to have been able to contribute as a Belgian family business to such a prestigious project.”
Question about this story? Ask your question
Wie aan RIVM/CBG-gebouw werkte
- preservationTilkin Powder CoatingsIn this story
Keep following this
Get an email when a new story is published. No account needed.
- ProjectRIVM/CBG building
- SubjectGeneral
- CompanyTilkin Powder Coatings