VMRG

Be careful what you wish for

Mr. Bettina Hertstein www.bouwrechtbedrijf.nl
Mr. Bettina Hertstein www.bouwrechtbedrijf.nl

It was not a tale from the 1001 Nights, but the cold reality of 1,000 days after their home was completed, that left relations between the clients and their contractor so strained that they asked an arbitrator to clear the air.

It all began so well. Two clients wanted a home, and they commissioned a contractor to build it. Not just any home, but an energy-neutral one. An air-source heat pump with a 300-litre buffer tank was therefore installed, along with 2 flat-plate collectors on the roof of the storage room and 18 solar panels on the rear roof of the house. This system supplies low-temperature hot water (around 35 degrees Celsius) to the underfloor heating in every room of the house, except the unheated storage room.

It seemed too good to be true. The system failed to meet expectations. No hot water, or far too little of it, gave the clients a chill. The contractor, accompanied by his heating installer and sometimes also by the manufacturer, visited dozens of times to tackle the problems with the heating system. The buffer tank was replaced with one with a greater capacity, thermostats were moved, valves were replaced, and anything else that might help was adjusted and commissioned. After around 1,000 days from completion, the system is now working to everyone’s satisfaction.

All’s well that ends well? No, because that usually only happens in fairy tales. The heating system’s inadequate performance caused the clients to suffer losses for which they want compensation. During negotiations with the contractor, he informed the clients that his heating installer was prepared to pay €2,500 in compensation for their losses. After they rejected this offer, the contractor increased the amount to €3,000 as a gesture of goodwill, for the inconvenience experienced by the clients and their other costs. After they turned down this offer too, the clients took their case to an arbitrator.

The clients are seeking a substantially better offer than €3,000 from the contractor. They consider compensation amounting to €3 per day too little. They had to pay an extra €2,200 in energy costs, and had to take time off work on many occasions to receive the contractor and his heating installer. They also incurred costs for their legal representative. In addition, they consider, as they stated at the hearing, that compensation of €13,500 for “inconvenience suffered” (based on €15 per day x 900 days) is reasonable.

The contractor does not dispute that there were problems with the heating system, but disputes that the loss of enjoyment of their home alleged by the clients is, in itself, sufficient grounds for awarding non-pecuniary damages (compensation for distress). He also argues that the alleged financial loss has not been substantiated and should therefore be rejected. He further seeks an order requiring the clients to pay the costs of the proceedings.

The arbitrator finds that all the problems have been resolved and that the system is working to the clients’ complete satisfaction, with heating costs of around €10 per month. He considers it plausible that the problems, which have since been resolved, resulted in financial loss in the form of additional heating costs. In the arbitrator’s view, the loss of enjoyment of the home alleged by the clients does not fall within any of the categories of financial loss set out in Article 6:106 of the Dutch Civil Code. He rules that, as the contractor rightly argued, there are no grounds for awarding non-pecuniary damages. He considers it plausible that the additional heating costs amounted to €2,200 and that the clients incurred €800 in costs for out-of-court debt collection and time off work. The clients are entitled to €3,000. The contractor is ordered to pay this amount to them.

And then an elephant came along with a very long trunk and… No, not yet. Because the clients wrongly rejected the contractor’s adequate offer of €3,000, they are ordered to pay the costs of the unnecessary arbitration proceedings, amounting to €3,762.

Be careful what you wish for, as King Midas discovered when everything he wished for turned to gold at his touch! Have you been touched by another metal, such as aluminium or steel? VMRG members make your dreams of metal windows and façade elements come true.

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectVMRG
Share this article

Advertisement

Follow Gevelbouw

Follow