De Peperklip: refurbishment respects iconic design

In Rotterdam’s Kop van Zuid district, the striking De Peperklip building has been fully restored following a thorough and much-needed refurbishment. The façades, stairwells and flats themselves were all renovated. The façade window frames were also replaced. The new frames strike the perfect balance between aesthetics, respect for the original design and the stringent technical requirements for natural ventilation and acoustics.
The refurbishment of De Peperklip ranks among the largest renovation projects in Dutch history: between 2017 and 2020, 545 flats and 8 commercial units underwent extensive renovation. What makes the project particularly remarkable is that residents remained in their homes throughout the construction work.

From ‘make-up’ to ‘makeover’
A remarkable achievement by housing association Vestia, which, together with the municipality, wanted to make the building ‘future-proof’, both technically and in terms of maintenance. The work also had to respect the design, now over 40 years old, by architect Carel Weeber. The building resembles an unfolded paperclip, but takes its name from the clippers (ships) that brought pepper into the harbour. At the same time, the project had to meet residents’ needs. What began as a superficial ‘make-up’ turned into a thorough ‘makeover’ of the entire building. Design architect Clara Froger was given an extensive brief, with particular responsibility for ensuring that De Peperklip retained, and even regained, its distinctive character. Rather than seeing the work as a renovation or maintenance project, she viewed it as ‘preservation’, taking account of the wishes of both the client and the residents.
Choosing aluminium
Willem-Jan Paijmans of Molenaar & Co Architecten also came on board as a technical and architectural adviser, translating Clara Froger’s designs into suitable technical details and illustrating the options for both the project team and the planning and design review committee. Paijmans explains: “Alongside a redesigned lighting plan and acoustically and visually improved entrance halls and stairwells, the replacement window frames posed a particular challenge: striking a balance between what was technically feasible and remaining faithful to the original design. Aluminium soon emerged as the right choice in terms of ease of maintenance and aesthetics. However, the best way to integrate the ventilation grilles already present in the original design was less obvious.”

A healthy indoor climate
In Weeber’s original design, the lower sections of the window frames were fitted with bulky acoustic ventilation units. These supplied fresh air from outside while keeping noise out. Far from being the most attractive solution, this type of ventilation was also seen as irritating by residents. According to Clara Froger, they often taped the units shut, which of course had a detrimental effect on the indoor climate in the flats.
Clara Froger says: “It was therefore very important to think carefully about what we wanted to achieve when replacing the window frames. We worked through several stages. Our first proposal met with a firm ‘no’ from the planning and design review committee. We were sent back to the drawing board because the profile was much too bulky. Technically, we had already made a significant step forward, but ultimately we also wanted to return to the slenderness of the frames in the original design. The problem is that this is no longer achievable today, given the many technical requirements window frames have to meet, including those for the natural supply of fresh air.”
The contractor Maasmond and façade contractor Rollecate eventually mentioned that Renson had just launched an updated version of its Invisivent top-mounted ventilator. It had been adapted for the Dutch market so that the window frame’s front edge ran in a continuous line into the ventilator mounted above it when fitted against a subframe. This was a major advantage for the project team. The resulting appearance was also well received by the planning and design review committee and was ultimately approved.

Added aesthetic value
Jan Smit, project manager at Rollecate, says: “Without Renson’s Invisivent NL, we would not have had a standard connection between the window frame and the top-mounted ventilator. That would have taken more time and effort to install. Instead, we could work very efficiently: remove the old frame, fit the new frame and ventilator as one unit. Done! It was also a bonus that residents experienced as little disruption as possible during the renovation, especially as they continued living there throughout the work.”
“Renson was involved from my very first meeting with contractor Maasmond,” Smit explains. “They provided the solution with the greatest aesthetic value. Working with their technical team, we did everything we could to adapt the ventilator so that the frame’s front edge continued seamlessly across it. The ventilator truly became part of the frame. This also eliminated the risk of leaks, both in terms of sound insulation and energy performance.”
Question about this story? Ask your question
Who worked on it
De Peperklip in Rotterdam
- clientVestia
- technisch-architectonisch adviseurMolenaar & Co Architecten
- contractorMaasmond
- façade contractorRollecate
- window ventilation grillesRenson
Keep following this
Get an email when a new story is published. No account needed.
- ProjectDe Peperklip
- ThemeWindows, doors and entrances
- SubjectVMRG
- CompanyVestia
- CompanyMolenaar & Co Architecten
- CompanyMaasmond
- CompanyRollecate
- CompanyRenson