VMRG

De Zalmhaven: A project of extremes

De Zalmhaven: A project of extremes

At 215 metres, De Zalmhaven is the tallest residential building in the Benelux. It is truly a project of extremes, for which a range of innovative techniques was devised to make the seemingly impossible possible. The result is certainly something to behold. A look back at this exceptional project in ‘Manhattan on the Maas’ with both façade contractors, Rollecate and Byldis.

De Zalmhaven is located in Rotterdam’s Scheepvaartkwartier district and comprises three towers and a podium building. The 215-metre-high Zalmhaven I (high-rise), designed by Dam & Partners Architecten, contains 256 apartments, four floors of luxurious penthouses and a panoramic restaurant almost 200 metres above ground. 

The ‘lower’ section (mid-rise) was designed by KAAN Architecten and comprises two 70-metre towers (Zalmhaven II and III) on a four-storey podium building. The two towers contain a total of 196 apartments and 33 houses, as well as a shared roof garden and car park. 

A floor a week

Commissioned by main contractor BAM Bouw en Techniek | Grote Projecten, Byldis supplied the prefabricated shell for the high-rise, as well as the aluminium façades for the mid-rise. Rollecate, in turn, supplied all the window frames and balcony doors for the high-rise, and installed the unitised façade at the top of the tower, enclosing the penthouses, panoramic restaurant and plant room. The high-rise also ‘rests’ on a four-storey podium building, whose shell was cast in situ. “We were commissioned to provide the façade enclosure here, in the form of large curtain walls and window frames made from curtain wall profiles,” says Erik Beekman of Rollecate. “From the 5th to the 52nd floor, the shell was built using Byldis precast concrete elements. This was done in a very unusual way, using a lifting shed that was jacked up by one floor each week. The façade below it was immediately made wind- and watertight.” To meet the tight schedule, Rollecate fully prepared around 1,750 window frames and installed them in the precast elements at Byldis’s Veldhoven facility. “By contrast, the eight balcony doors on each floor were fitted with one or two corner units and timber subframes at the assembly site in Rotterdam. These were then transported to the construction site and lifted into place and installed on the floor slabs as a single unit using a specially developed lifting frame. This extensive prefabrication meant that we hardly needed to be on site until it was time to install the unitised façades at the top.”

Quality system

For the window frames and balcony doors from the 5th to the 52nd floor, Rollecate used a Schüco AWS 75 profile with a specially manufactured extrusion. “For this project, the profile was fitted with a lip on the inside to ensure a good connection to the concrete,” Beekman explains. “To meet the high test pressure specified by VMRG, 750 Pascal for buildings over 150 metres tall, the profile was modified with a larger pressure-equalisation chamber to improve ventilation and drainage. This was, of course, extensively tested and measured in advance. We also carried out continuous testing while the window frames were being manufactured at our factory in Staphorst, to ensure that we delivered the promised quality and a reliable construction. The frames were even tested on site. All this information was also documented in a quality logbook. In effect, a complete quality system was set up for De Zalmhaven, in line with the standards of the Quality Assurance Act, which comes into force next year.”

Pièce de résistance

For Rollecate, the unitised façade from the 53rd floor upwards was the pièce de résistance. “A great many techniques come together here,” says Beekman. “To build the crown, which steps back progressively, the roof of the lifting shed was opened. This was also known as the convertible mode. Because the upper floors are set back, the lifting shed could not climb any higher. Unlike the usual approach, we built the unitised façade from the top down. We started with the upper section, which was then jacked up from the lifting shed so that the next unit could be installed beneath it. This process was repeated three times. The method may sound simple, but it meant, for example, that all the seals had to be redeveloped. Schüco proved a very helpful partner, working with us to find solutions. Entirely new seals and neoprene components were developed to make the façade buildable and ensure it met the most stringent air- and watertightness requirements. The test pressure was again 750 Pascal. Additional profiles and reinforcements were also added to ensure the required sound insulation against flanking noise. Once this façade had also been sealed, the lifting shed was slowly jacked down and the guide components at the corners were dismantled. At the same time, we added insulation to the corners and clad them. The lifting shed was then dismantled on the 4th floor.”

Without subframes

Construction of the mid-rise and podium building took place more or less in parallel with the high-rise. Byldis once again played a major role, this time delivering the aluminium façade enclosure. “Unlike the high-rise, the mid-rise shell was built using tunnel formwork and columns. The idea was to install the window frames directly between the columns, without subframes, so that the building envelope could be sealed in the same operation,” says Marcel van Bruggen of Byldis. “We have had good results with this approach on other projects in the past, and used the same method at Zalmhaven II and III.    

A special profile was extruded so that the external architectural skin by Aldowa could be suspended on the outside, while a sealant joint alone would suffice on the inside. Across the entire project, we installed around 17 kilometres of anchors and seals, along with a further 16 kilometres of neat sealant joints. A floor was handed over every six days, fully wind- and watertight and complete with aluminium cladding. And so the production line raced upwards. After 62 weeks, both towers and the podium building were wind- and watertight.”

Prestige project

Byldis supplied and installed around 10,000 m2 of window frames for the two towers, amounting to approximately 1,800 frame units averaging 230 cm high by 180 cm wide. Van Bruggen says: “The frames use Aluprof’s MB 86 series, a profile system that we have used successfully on similar projects elsewhere, including in London. It also meets the specified Qv10 requirement of 450 Pascal for watertightness and 650 Pascal for airtightness. We made some minor adjustments to the balcony doors, such as lowering the threshold, to meet the requirements. The façades of the penthouses on the upper floors of the 22-storey towers use timber frame elements. We also supplied and installed the window frames in these.”

For both Byldis and Rollecate, this was very much a prestige project. “The many innovative techniques, together with the extremely tight schedule and the streamlined logistics managed by main contractor BAM with all its suppliers and subcontractors, have produced a fantastic result,” concludes Van Bruggen.

Project details

Zalmhaven towers, Rotterdam 

Client: 

Amvest, AM

Architects: 

KAAN Architecten, Dam & Partners Architecten, Kees Christiaanse Architecten & Planners 

Contractor: 

BAM Bouw en Techniek |
Grote Projecten

Façade contractors: 

Rollecate, Byldis Facades 

Façade cladding: 

Aldowa

System suppliers: 

Aluprof Nederland and Schüco Nederland BV

Surface treatment: 

EUROLACKE

Question about this story? Ask your question

Companies in this story

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectVMRG
  • CompanyEUROLACKE B.V.
Share this article

Advertisement

Follow Gevelbouw

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.