As is often the case when buying a new-build home, the buyers had high expectations. Too high? When they discovered during construction that they had been given different panels from those they had expected based on information from the developer, they felt they had been treated unfairly. Was that feeling borne out by the legal facts?

The buyers signed a sale and construction agreement (the agreement) with the developer (the contractor) for their four-storey townhouse with a garden. During construction, the contractor regularly kept the buyers informed of progress and any changes to their home through newsletters. When the buyers noticed that aluminium panels had been fitted in the tilt-turn windows on the front façade on the 2nd and 3rd floors instead of glazing, they emailed the contractor. In its reply, the contractor referred to the artist’s impression and newsletter number 3. Under the heading “Front façade window frames”, it stated that the opening sections in the front façade window frames on the 2nd and 3rd floors, to the left and right of the central pane, would have a tilt-turn window with a colour-matched insulated aluminium panel instead of just a tilt-turn window with clear glass. As for the artist’s impression, the contractor said that the image was exactly as specified by the architect. In the subsequent correspondence between the parties, it emerged that the colour tint of the panels had unfortunately been lost when the sales documentation was copied, making it look as though glass would be installed.

At handover, the buyers had their complaint recorded in the handover report. The contractor noted that it disagreed with the comment. After handover, tensions between the parties ran high. The arbitrator was asked to shed light on the panel dispute. The buyers argued that the contractor had deviated from the agreement without this being a necessary change. Their primary claim was for the aluminium panels in question to be replaced with glass. If replacement was not possible or proportionate, they sought compensation of € 34,000.00 for the loss in value of their home due to reduced daylight and enjoyment of the home, in line with the valuation report they submitted in the proceedings. The contractor defended its position in detail, arguing that it had fulfilled its obligations. It also argued that the buyers had complained a year after receiving the relevant newsletter, and therefore too late to rely on it. The contractor sought the full or partial release of the bank guarantee of around € 15,000.00 retained by the buyers.

After hearing the parties’ submissions on the artist’s impression, as well as on the technical specification and drawings, which the agreement expressly states form an integral part of it, the arbitrator reached a decision. 

The artist’s impressions shown on the website at the time, on Facebook and in the sales brochure, as well as on the cover of the buyers’ folder, do not form part of the agreement. They are not identified as contractual documents anywhere in the agreement or the accompanying documents. Nor does the artist’s impression have a ‘clarifying’ role in legal terms in this case, because there are other contractual documents on which to rely. The technical specification does state “panels in window frames”, but not where the panels would be installed. The fact that the buyers are not construction professionals means that they could not reasonably have been expected to anticipate aluminium side panels on the 2nd and 3rd floors. The buyers were not held responsible for only contacting the contractor about the newsletter a year later, because they had no reason to expect it to contain such important information about their home. The contractor’s argument that the buyers had breached their duty to complain in good time was rejected. 

Having considered all the circumstances, the arbitrator concluded that the contractor had failed to meet its obligations. The arbitrator rejected the claim for replacement of the panels. The alternative claim for compensation for loss of value due to reduced daylight was upheld, with the loss in value reasonably assessed at € 7,500.00. The buyers were ordered to release the bank guarantee within seven days of the contractor complying with the order to pay compensation.

Want to avoid friction over a façade and prevent tensions? Check with the façade specialists at VMRG. They know what to do! 

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeCollaboration in the facade industry
  • SubjectVMRG
Share this article

Advertisement

Follow Gevelbouw

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.