The Mayor: luxury residential development with international appeal

Text Lieke Bousema, Roel van GilsImage Kawneer/fotograaf Dirk Verwoerd

The Mayor: luxury residential development with international appeal

More than 10,000 m2 of aluminium frames 

The former KPMG office complex ‘De Bovenlanden’ on the A9 near Amstelveen was one of the largest office buildings in the Netherlands for many years. Its long, linked building volumes stretch for more than half a kilometre. The building has been completely stripped back and rebuilt as a luxury residential development with international appeal: The Mayor. Schipper Kozijnen supplied and installed more than 10,000 m2 of stylish, durable and low-maintenance aluminium frames and sliding doors from Kawneer’s system house.

The Mayor bears no resemblance to the sprawling office complex with its distinctive blue frames. The design was completely transformed, dividing the colossal structure into eight smaller buildings. This required substantial structural work. An additional storey was also added to the roof. The organic style of the original has given way to a clean-lined, welcoming building finished in Mediterranean-style render and featuring extensive glazing. A great deal of glazing. The Mayor now comprises eight high-end residential buildings with 315 owner-occupied and rental apartments, 39 luxury penthouses and 10 park villas, all surrounded by greenery and water. 

Façade openings

The design brief was to create maximum comfort for residents within the existing façade openings. Schipper Kozijnen therefore replaced the old blue frames with more than 10,000 m2 of aluminium frames. The renowned North Holland family business supplied and installed around 2,700 frames and sliding doors from Kawneer’s RT 72 Reflex and AA 41100 ranges. It also supplied 700 glass acoustic screens and 700 glass fall-protection barriers. Alongside a luxurious appearance and optimum comfort for residents, the key priorities were maximising daylight, safety, solar shading and noise reduction. In short, optimum comfort for residents. 

Acoustic insulation

Schipper Kozijnen was involved in the project at an early stage, particularly to advise on the construction details. “The existing openings were carefully measured. We also considered how to ensure a perfect connection to the existing structure with as little labour and material as possible,” says Jappe Dekker, Head of Sales, Commercial Market at Schipper Kozijnen. “As this was a conversion from offices to luxury homes, great attention was paid to maximising daylight and acoustic insulation. To achieve the latter, acoustic screens were fitted to the frames on the motorway side, among other measures.    

“Based on all the requirements and wishes, our findings, knowledge and expertise, we developed the details further and coordinated them in 3D/BIM. We also helped build the show apartment, giving buyers a clear view of their future home and helping us achieve the optimum in circularity, sustainability, installation time and price.”

Optimum airtightness

All frames have a black finish on the outside, while the inside has a black or white coating, depending on the location. “All opening sections feature concealed fittings and hinges, combining a refined finish with optimum airtightness,” says Jappe. “The sliding doors, measuring up to 3 x 2.5 metres (w x h) and with sash weights of up to 300 kilograms, were fitted with innovative soft-close technology to prevent noise transmission when closing. We developed this technology in close collaboration with our ironmongery supplier and the construction consortium.”

Different types of glazing

The frame units were delivered to the project fully glazed to ensure a smooth installation process. “HR++ glass was selected in several configurations,” says Jappe. “The 700 façade acoustic screens have an extra-clear coating to prevent reflections.” It is also important that the acoustic screens can be cleaned. “To meet this requirement, we developed slim, cleanable screens in-house, using low-iron, extra-clear glass. The various components were printed on our own 3D printer, for example to test dimensions and connections. On the sunny side, by contrast, the glazing has a specific solar-control coating that keeps out the sun’s heat without compromising daylight transmission.”

Naturally, safety also received extensive attention on this project, Jappe adds. To make maximum use of the existing façade openings while ensuring optimum safety and daylight transmission, Schipper Kozijnen installed glass fall-protection barriers in the bottom 40 centimetres of the tilt-and-turn windows. “These barriers are also made from extra-clear low-iron glass, bringing the luxurious appearance to the highest level here too. In short, this is truly an outstanding transformation.” The Mayor has been fully occupied since the end of 2023.  

Een zakelijke vraag aan Architect at Work? Get in touch

Who worked on it

The Mayor in Amstelveen

  1. ClientM.J. de Nijs Project III B.V.
  2. ArchitectArchitectenbureau Marcel van der Schalk
  3. ContractorUBA: de Nijs Amstelveen V.O.F.
  4. Façade contractorSchipper Kozijnen BV
  5. System supplierKawneer

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectThe Mayor
  • ThemeWindows, doors and entrances
  • SubjectVMRG
  • CompanyM.J. de Nijs Project III B.V.
  • CompanyArchitectenbureau Marcel van der Schalk
  • CompanyUBA – de Nijs Amstelveen V.O.F.
  • CompanySchipper Kozijnen BV
  • CompanyKawneer
Share this article

Advertisement

Follow Gevelbouw

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.