Until recently, drivers on the A58 near Tilburg have been ‘treated’ to a striking view of Rhenus Logistics’ futuristic-looking New Logic III distribution centre. Curved forms in steel, glass and aluminium define The Tube, as the warehouse, which covers more than 60,000 m2, has affectionately come to be known. A considerable challenge for the people who built it, then. In fact, without 3D engineering, it would have been an impossible job. A conversation with the architect, façade contractor and system supplier.

The first things that stand out in the design of New Logic III are its distinctive shape and extensive use of glass. For Habeon Architecten, the site alongside the motorway was the inspiration for this form. A rectangular shape, architect Hung Tran explains, would not have done justice to the dynamism of the location. “We therefore opted for a more natural elliptical shape, which we also combined with very high ambitions for sustainability (BREEAM-NL Outstanding) and aesthetics. The result was a futuristic, energy-efficient distribution centre. A large cut-out in the volume makes the shape intriguing and unique for a logistics building.”

Functional advantages

New Logic III is immense in scale. The distribution centre covers a total of 60,400 m2, comprising approximately 40,000 m2 of warehouse space, 3,400 m2 of office space and 17,000 m2 for Value Added Logistics (VAL). The elliptical shape also has functional advantages. The building features extensive glazing to let in as much daylight as possible and create comfortable working conditions. The large canopy created by the cut-out on the south side also provides solar shading for the office and the VAL operations behind the curtain wall. The Tube has a Kalzip standing-seam roof system, aluminium curtain walls and frames. “Aluminium is ideal for minimising the amount of visible material,” says the architect. Given the challenging forms, both Portalume Systemen and Reynaers were involved in the project at an early stage. “Initially, we advised the architect on the structural design of the CW 50 curtain wall system, taking account of the site and dimensions. At a later stage, we advised on the aesthetics,” says Theo Karnebeek of Reynaers. The CW 50 curtain wall series and the CS 77-HI window and door system were ultimately selected.

Non-standard pressure plates

Portalume Systemen has worked with Habeon and Dokvast before. “We know the client’s and architect’s requirements and standards from previous projects we have tackled together. That made getting this project started much easier,” says Peter Muller of Portalume Systemen. “We work exclusively with Reynaers profiles and always know how to strike the right note, both technically and aesthetically.” Theo Karnebeek agrees, adding: “We are always happy to provide advice and support to fabricators working with our profiles. Portalume Systemen certainly made full use of its expertise on this unique project. We only added input where needed, for example on the different pressure plates. To meet the brief for a minimalist design, different pressure plates were used horizontally and vertically. The horizontal, flat pressure plates are given extra emphasis, while the slim vertical pressure plates almost disappear into the façade.”

Craftsmanship

According to Muller, a great deal of time was spent on the preparatory work. “3D engineering and drawing were essential to make the challenging curtain wall forms buildable and coordinate them with the other parts of the building. The different radii of the elliptical curtain wall added another layer of complexity.” Once everything had been worked out digitally, Portalume produced a mock-up of the end curtain walls. “Once it had been approved for production, we began fabricating the Reynaers profiles. We normally machine almost all profiles, but the curved forms were crafted by hand using custom-made templates.” Portalume also supplied and installed the large revolving door, with a circular closure fitted with curved sliding doors, as well as a curtain wall on the roof to bring extra daylight into the building’s top floor. “The difficult-to-access location of this curtain wall, combined with the large size of the glass panels, posed a few more challenges,” says Muller.

An example to follow

Muller says: “Our aim was to translate the client’s and architect’s wishes into a design that was both buildable and reasonably affordable. We achieved optimisations at several levels. For example, we were able to order the glass in special sizes to suit non-standard pallet dimensions. This reduced waste and improved efficiency.” The large quantities involved (3,700 m2 of curtain walling), relatively short lead time and unique forms made the project anything but standard for Portalume Systemen. “Thanks to good coordination and excellent collaboration with both the architect and the contractor, the project ran extremely smoothly. A success story for us, and certainly for our client too,” says Muller. The architect concludes that the futuristic New Logic III is rightly an example for future distribution centres.

A business enquiry for Reynaers? Get in touch

Who worked on it

New Logic III in Tilburg

  1. System supplierReynaers
  2. architectHabeon Architecten
  3. façade contractorPortalume Systemen
  4. clientRhenus Logistics

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectNew Logic III
  • SubjectVMRG
  • CompanyReynaers
  • CompanyHabeon Architecten
  • CompanyPortalume Systemen
  • CompanyRhenus Logistics
Share this article

Advertisement

Follow Gevelbouw

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.