The Quality Assurance (Building) Act (Wkb), which comes into force on 1 July 2022, requires construction parties to ensure that all requirements are met and to record evidence of compliance. This also calls for changes to internal quality and process controls.

The new legislation applies to all parties in the construction chain: developers/clients (including architects and specifiers), contractors, subcontractors, quality assurance assessors and the competent authority. Since VMRG façade contractors operate as subcontractors in the construction process, the building contractor will transfer its responsibilities for the façade directly to the relevant façade contractor. A VMRG working group has therefore spent recent months developing a proposal to ensure that the VMRG Quality Mark quality system meets the requirements of the new legislation.

Risk assessment and control plan

Under the Quality Assurance (Building) Act, a risk assessment of the building and a control plan based on it must be submitted
to the competent authority when notifying it of the building activity, no later than four weeks before construction starts.

The VMRG working group therefore believes that façade contractors should follow the same approach. 

  • Risk assessment: The risk assessment must include all risks that could potentially result in the completed façade failing to meet the requirements of the Besluit bouwwerken leefomgeving and the VMRG Quality Requirements and Recommendations.
  • Control plan: The control measures required to address the risks are then set out in the inspection and assurance plan. The principles are to record matters that can no longer be checked afterwards, such as parts of the façade that will be concealed, and to carry out checks so that any error is eliminated from the process as quickly as possible.

Façade construction handover file

The outcome of the inspection and assurance plan, supplemented by drawings, calculations and information about the building’s intended uses, the materials used, and management and maintenance, forms the façade construction handover file. This file fits seamlessly into the contractor’s project file. The contractor compiles the file for the competent authority (consequence class 1 only) and/or the consumer/handover file (all consequence classes). 

Figure 1, VMRG Quality Mark quality system with façade construction handover file.

New quality system

Much of the façade is already determined during the engineering and work preparation process, which is why this process has a prominent place in the new quality system. Alongside this process, called VMRG Engineering, VMRG Production and VMRG Installation are the two other subprocesses in the new VMRG Quality Mark quality system. 

The whole process is shown schematically in Figure 1. The blue lines represent information flows within the VMRG Quality Mark company. The red lines represent information flows between the client and the VMRG Quality Mark company. The requirements for, and implementation of, the building framework are also discussed and recorded between the client and VMRG Engineering. The green lines show the output of the three processes, which in turn provides input for the façade construction handover file. The line between the Client and VMRG Installation relates to the building framework. The client must provide a building framework as agreed with VMRG Engineering. If VMRG Installation finds that this has not been provided, installation cannot proceed. The new quality system is project-based and
schedule-driven. 

This has led to an inspection and assurance plan that sets out how checks must be carried out and which matters must be recorded and included in the façade construction handover file. It specifically states how often checks must be carried out and how matters must be recorded, for example by taking photographs. The results are included in the façade construction handover file. 

Over the coming period, the new quality system will be introduced at all VMRG Quality Mark companies and further optimised based on their input.  

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeSafe and verifiable facade construction
  • SubjectVMRG
Share this article

Advertisement

Follow Gevelbouw

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.