Willinkplein in Emmen has undergone a major transformation. The existing underground car park has been substantially expanded, and an exclusive new building has risen above the square, housing commercial space, a hotel, restaurants and two penthouses. What began as a fairly standard job became a project full of challenges for façade contractor Polybouw Aluminium bv.

As a regular partner of main contractor Akor, Polybouw was responsible for supplying and installing curtain walling, window frames, sliding doors and automatic entrance systems, including glazing and panels. “We have had a very good relationship with Akor for more than 25 years, and they awarded us this contract,” says Jan Tijhof, director of Polybouw. But before Polybouw could get started, the ground level first had to be prepared. The existing two-storey underground car park was substantially expanded by around 5,000 square metres.

Gold-coloured composite

A building measuring 92 metres long and 57 metres wide has risen on Willinkplein, with its highest point at around 23 metres. Fletcher Hotels is taking the largest part of the new building, with the entrance on the ground floor and the lobby on the first floor. A total of 88 hotel rooms are located on the second, third and fourth floors. The building is a real eye-catcher, with a striking gold-coloured aluminium composite façade. The original plan was to finish the façade with brick slips, but this was changed to composite during the design process. The result brings the design to life more effectively: the composite gives the building a luxurious appearance. All the façade panels, including the curved elements, are finished in a warm gold tone. The façade elements on either side of the building are rounded. 

A real pleasure

Polybouw chose Kawneer systems for the curtain walling, window frames and sliding doors at Willinkplein. “There is a wide variety of profile types, all highly insulating and sustainably produced,” says Tijhof. What began as a fairly standard job turned into a challenging project, including for Polybouw. “Various changes were made at the last minute during the project, from colour changes to revised layouts, even just before handover,” Tijhof recalls. “But we achieved our goal: a fantastic end result, and a satisfied client and building owner. Working with Akor was a real pleasure. We completed the project successfully together, in a spirit of good cooperation.”  

Project details
Willinkplein, Emmen

Client: 
Peter van Dijk Willinkplein BV

Architect: 
Dok Architecten

Façade contractor: 
Polybouw Aluminium BV

System supplier: 
Kawneer

Question about this story? Ask your question

Who worked on it

Willinkplein in Emmen

  1. ClientPeter van Dijk Willinkplein BV
  2. ArchitectDok Architecten
  3. Façade contractorPolybouw Aluminium BV
  4. main contractorAkor
  5. System supplierKawneer

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectWillinkplein
  • SubjectVMRG
  • CompanyPeter van Dijk Willinkplein BV
  • CompanyDok Architecten
  • CompanyPolybouw Aluminium BV
  • CompanyAkor
  • CompanyKawneer
Share this article

Advertisement

Follow Gevelbouw

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.