Winter is once again in full swing. This means that storing and maintaining façade cladding requires special attention.

Winter is once again in full swing. This means that storing and maintaining façade cladding requires special attention.

In some cases, when weather conditions are so extreme, installing plastic façade cladding is even inadvisable!

Storing façade cladding
It starts with storing façade cladding when it is delivered to the workshop. All façade panels must be handled with the utmost care, which benefits the quality of the finished result. The façade panels must be stored off the ground, horizontally and on a flat surface. The panels need adequate support, and we recommend covering them with a tarpaulin to prevent dirt and damage. The packs can also be stacked, provided they are adequately supported.

It is very important to allow the façade panels two days to acclimatise to their surroundings. At temperatures below 5 °C above zero, additional measures must be taken, such as storing them in a heated, dry storage area.

Maintaining façade cladding
The weather must be taken into account not only when storing façade cladding, but also when maintaining it. For the best results, we recommend cleaning the façade cladding twice a year.

If you are cleaning in winter, there are a few things to bear in mind. First, make sure you do not use corrosive chemicals, which can cause defects in the top layer of the façade cladding. Use a simple household detergent mixed with water.

In winter, snow or rain may fall on the façade cladding. Before cleaning, you must first clear any snow from the façade. Make sure there is no dirt left on the façade cladding before you start cleaning. Scrubbing dirt can spread it across the surface and scratch the top layer of the façade cladding.

Finally, using hot or warm water is strictly prohibited. Hot water exposes the façade panels to extreme temperature fluctuations in a very short time. This can cause the panels to expand and contract excessively, resulting in colour loss and cracking.

Installing façade cladding
In addition to the rules for storage and maintenance, façade cladding must not be installed at temperatures below -5 degrees. This is firstly for the installer’s safety and secondly because the material expands and contracts excessively when temperatures fluctuate.

Source: Milin

A business enquiry for Milin B.V.? Get in touch

Companies in this story

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeFacade design and construction
  • SubjectPanels & profiles
  • CompanyMilin B.V.
Share this article

Follow Gevelbouw

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.