High-performance window and curtain wall systems for Prologis DC4

Eindhoven is one of Europe’s most important trading centres and a key economic hotspot in the Netherlands. It is a sought-after region for many logistics providers. Prologis knows this too. The developer and provider of industrial real estate commissioned the development of Prologis DC4, a brand-new, highly sustainable distribution centre at GDC-Noord in Eindhoven. Van Iersel Geveltechniek was responsible for the design and installation of the high-quality window and curtain wall systems, including the striking aluminium banding. A project that whets the appetite for more…
With its location and excellent transport infrastructure, Eindhoven is ideally equipped to meet the logistics needs of international trade. GDC-Noord lies just north-west of Eindhoven and is a multimodal site with almost direct access to four major motorways: the A2, A50, A58 and A67. It also has a rail connection to a terminal on the Rotterdam-Eindhoven railway line. Eindhoven Airport is just 3 kilometres away. The new Prologis DC4 occupies a 9-hectare site and has a floor area of approximately 29,000 m2.

High thermal insulation
Prologis DC4 can easily be divided into units of around 11,000 m2. The distribution centre also has a mezzanine above the loading area and an attractive office section. “As a partner to main contractor Van der Heijden Bouw en Ontwikkeling, we contributed to the design of the building envelope,” says Corné van den Broek of Van Iersel Geveltechniek. “For us, this involved around 1,200 m2 of curtain walling and window systems. Although the office section accounts for only a small proportion of the total floor area, it made up the bulk of the façade work. We installed around 450 m2 of Schüco ADS 75 SI window systems and 780 m2 of Schüco FWS 50 curtain walling. The choice of highly insulating systems was primarily driven by the required insulation values and the option of installing triple glazing.”

Diagonal aluminium banding
According to Van den Broek, a particular feature of the project for Van Iersel Geveltechniek was the white banding, made from aluminium box sections, on the office façade. “It may not have been especially complicated, but it still required careful attention,” he recalls. “The box sections forming the diagonal banding are anchored to the
horizontal and vertical curtain wall profiles.
We deliberately kept the distances as short as possible to ensure maximum stability. That was, of course, not possible in the section with a clear span at the front of the office building. Here, the box sections were additionally reinforced internally with steel wherever necessary. We also had to deal with relatively large panes, which were stacked in the curtain walling. This, too, required careful coordination to transfer the glass loads, of up to around 700 kilograms, onto the backing structure as directly and efficiently as possible. As mentioned, none of this was earth-shattering, but it did make the project that little bit more special.”

Van Iersel Geveltechniek spent just under twelve weeks installing the window and curtain wall systems on site. Prologis DC4 was officially completed in March 2021. “The building as it stands now is actually only about half the planned development,” says Van den Broek. “It is part of a larger scheme. The intention is to add another identical building, mirrored on the left-hand side. The start date for this phase 2 is not yet known, but we are hopeful that we will also be awarded the work on this new building, which will be almost an exact copy.” Prologis DC4 has been awarded BREEAM Outstanding certification, which is no longer a major challenge for Van Iersel. “In recent years, we have worked on several projects with sustainability labels, so they are now almost the rule rather than the exception.”
Question about this story? Ask your question
Who worked on it
- ClientPrologis DC4
- ArchitectJohan de Vries Architect BV
- ContractorVan der Heijden Bouw en Ontwikkeling BV
- Façade contractorVan Iersel Geveltechniek
- Systems supplierSchüco Nederland BV
Keep following this
Get an email when a new story is published. No account needed.
- ThemeFacade design and construction
- SubjectVMRG