Maximum flexibility with a high-quality aluminium curtain wall
Text Roel van GilsImage Bouwbedrijf Vrolijk

DKG Groep has had its new head office built on the site of the former DAF workshop in Bergen op Zoom. The striking building, with its distinctive timber canopy, is characterised by a high degree of transparency. The two-storey office building has an aluminium curtain wall installed around it by Gruijters Aluminium, from ground-floor level to the roofline.
The new DKG Groep office building is 80 metres long and 27 metres wide, and provides a workplace for more than 300 employees. DKG is the group behind the Bruynzeel Keukens, Keller Keukens and DKG Keukens brands. The company literally makes its own brands itself at De Keukenfabriek in Bergen op Zoom. The aluminium curtain walls around the new building allow plenty of daylight into the many offices, meeting rooms and staff restaurant, creating a pleasant working environment. Gruijters Aluminium was brought in by building contractor Vrolijk at an early stage to develop the external envelope in detail. “We have successfully delivered several projects together in the past, and this project was right up our street too,” says Dirk Knijnenburg, work preparer at Gruijters Aluminium.

A varied façade
A curtain wall offers maximum flexibility, Dirk continues. “It makes it easy to span greater heights, and the slim sightlines of the profiles ensure maximum transparency. At DKG, the glazing is interspersed with flat sandwich panels, creating an attractive and varied façade.” Dirk says a key advantage of a curtain wall is that it makes it easier to install long façades without the need for subframes. “That said, we had extensive discussions with the main contractor to engineer this curtain wall. At the first-floor level and roofline, a band of timber planks appears to float in front of the façade, with its fixings attached to the vertical mullions. The connections for the imposing canopies, by contrast, pass right through our façade and into the primary structure.”
Non-standard anchoring
Gruijters Aluminium built the curtain wall using Reynaers’ CW 50 system.
Dirk: “We detailed the curtain wall profiles at the required centres. The vertical mullions were then fixed at three points: at ground-floor level to transfer the loads, with concealed fixings to the intermediate floor and one fixing at the roofline.”

According to Dirk, transferring the loads was something of a challenge, as the foundation slab is on the inside of the curtain wall. “So we couldn’t transfer the loads directly to the foundation. The main contractor also needed that space for insulation. We therefore made special two-part anchors, both to fix the wall to the floor and to position the mullions. The solid sandwich panels were supplied by a third party, and their detailing was fully coordinated with the clamping thickness of our profiles.”
Points to consider
Although Gruijters Aluminium engineered the external envelope using a standard Reynaers profile system, Dirk says there were several points to consider. For example, the curtain wall at the corners of the office building features a structural silicone-glazed joint.
The glass is supported by horizontal transoms that turn the corner on a mitred angle. These transoms were also fitted with additional support
anchors to carry the weight of the glass. “Given the considerable length of the façade and the fact that aluminium has a thermal expansion coefficient of 1 mm per metre, we assessed each bay to see where we could allow a little more tolerance to accommodate expansion and contraction. The pressure plates and cover caps around the brackets for the timber strips were also routed to ensure the neatest possible finish around the fixings. Flashings were also installed above the cantilevered canopy to prevent rain ingress.”
Another point to consider was the internal solar shading. “It was fixed at an appropriate distance from the inside of the horizontal transoms to prevent thermal breakage. Finally, the curtain wall mullions adjoining an internal wall were wrapped in insulation to prevent sound transmission.”
Based on the drawings, Gruijters Aluminium pre-assembled the entire curtain wall in separate components and delivered it to the site as a kit. “We began by installing the vertical mullions, followed by the transoms between them,” Dirk explains. “The bays were then fitted with either glazing or solid panels. We were quite far ahead in the project, so it was important to close in the façade as quickly as possible, allowing the interior fit-out and installation of all the building services to start on time. We did an excellent job of that, thanks to the good working relationship and coordination with the main contractor. All in all, another fine project for our portfolio.”
A business enquiry for Reynaers? Get in touch
Who worked on it
- Client:DKG
- Architect:Group A Architects
- Main contractor:Bouwbedrijf Vrolijk
- Façade contractor:Gruijters Aluminium
- System supplier:Reynaers Aluminium