On 27 November, VMRG hosted the online Expert Session ‘No panic: access and egress properly arranged’. Henk Zoontjens, director of VMRG, spoke with experts Jan Willem Koot, Specification Manager at ASSA ABLOY
Opening Solutions, and Bart van Oorschot, director at Van Oorschot Aluminium.
They discussed the theory and practice of access and egress in buildings. Escape routes, panic hardware and emergency doors: access to and egress from buildings must be properly arranged. In emergencies, this is vital. Participants had already submitted many questions in advance, which were also answered during the session. Here is a selection of the questions discussed.
How are responsibilities allocated during a construction project when it comes to applying the right standards and legislation for access control?
Jan Willem Koot: The building owner is responsible, but can delegate this to the contractor during construction or renovation by setting out the right requirements, to ensure compliance with legislation and regulations through an appropriate verification and validation process. The contractor has a duty to coordinate and must provide the façade contractor with the right information. They often bring in consultants for this.
Based on the output specifications, the façade contractor is approached for quotations at an early stage. The façade is a substantial part of the building, and the contractor must reserve production capacity with the façade contractor in good time. The problem is that the façade contractor receives only limited information about the doors, as the project brief is not yet complete. The design process is sometimes still under way while construction is already in progress, so changes may still be made.
How do you handle this with the contractor?
Bart van Oorschot: As a façade contractor, we are of course certified for escape doors. We advise the contractor on what is legally permissible, as well as on ease of use. We give this advice in consultation with the system supplier. If the application does not make clear what type of lock is required or what function a door serves, we include a provisional sum. Finding the right solution often requires a lengthy process involving the project planner and our partner for locks. Working together, we arrive at the best solution.

What is the relationship between the Bbl (Building Environment Decree) and European regulations?
Jan Willem Koot: Harmonised standards take precedence. The Bbl (Building Environment Decree) also specifies which other, non-harmonised European standards must be met. The Bbl takes a different approach to some matters. Under European regulations, EN 179 applies to an escape door in a non-public area. It determines when a lever handle may be used. EN 1125 applies to public areas and determines when a panic bar must be used. In the Netherlands, the requirement is that if more than 100 people rely on a door, EN 1125 applies, and the door must have a lock and panic bar set. Under the Bbl, EN 179 does not apply in the Netherlands if fewer than 100 people rely on a door for escape. The only exception where EN 179 does apply directly in the Netherlands is housing rented out by the room. The distinction between public and non-public areas is not made in the Netherlands. This distinction is made only in European regulations.
How do you check whether specifications comply with legislation?
Bart van Oorschot: We have a step-by-step plan developed in collaboration with our system supplier, and we also ask them for advice.
What is the difference between an escape door, an emergency door and a panic door?
Jan Willem Koot: The Bbl could be interpreted as follows: an escape door is a door relied on by fewer than 100 people. A panic door is one relied on by more than 100 people and must therefore comply with EN 1125. According to the interpretation of the Bbl, an emergency door is a door in the external façade that is not used except in the event of fire or for escape. It must be tested annually. The Bbl does not directly impose requirements on the opening mechanism of this emergency door, other than those in Article 4.217. CE marking indirectly applies to this door because it is in the external façade, as it does to any door in the external façade with a fire-resistance and/or escape-route function. Performance is declared in accordance with the harmonised product standards NEN-EN 14351-1 and NEN-EN 16034. These standards refer to EN 179 and EN 1125. The government’s designation matrices in turn refer to Article 4.217 of the Bbl to establish how the requirements should be applied. We then find the description given above: EN 179 applies to housing rented out by the room. If more than 100 people rely on a door for escape, it must comply with EN 1125.
Will door functions become clearer at an earlier stage of the construction process in future?
Jan Willem Koot: Perhaps through the Quality Assurance Act, which states that to obtain a building permit, you must demonstrate the building’s environmental performance. This is only possible if your design shows that the requirements will be met. Hopefully, this will also prompt us to think things through earlier and return to a little “old-fashioned” specification writing, with the building and its usage scenarios considered in advance.
What do you hope to see in future?
Bart van Oorschot: I agree. It would be great to have clarity from the very first drawing, as that would save a lot of work.