Pontkade has been completed at the iconic NDSM wharf, right on the IJ in Amsterdam. The substantial building comprises two residential towers and a total façade area of approximately 10,000 m2. Given the scale of the project, Hermeta Gevelbouw and Alkondor Hengelo joined forces in a unique, project-specific partnership, the Hermeta-Alkondor vof façade alliance.
A look back at the project with both parties.
Pontkade comprises two residential towers connected by a large courtyard garden. The ground floor of the complex houses retail and hospitality facilities, including a large supermarket. Offices and parking facilities have also been incorporated into the building. The upper floors contain a total of 252 owner-occupied and rental homes, including luxury lofts and penthouses. Hermeta Gevelbouw and Alkondor Hengelo joined forces to engineer, supply and install the aluminium windows and curtain walls.

Fifty-fifty
Alkondor Hengelo acted as lead partner in the project-specific partnership, while we were responsible for the technical management of the project, begins Marcel van der Sluijs, managing director of Hermeta Gevelbouw. “We operated as one company for our client. We were able to split the project almost fifty-fifty, with each of us taking responsibility for three building sections and jointly delivering around 5,000 m2 of façades.” Jan Bergman of Alkondor Hengelo adds: “The contractor built the sections at much the same time. This meant that a large area of façade was needed in a very short period. By joining forces, we were able to meet that demand.” Alkondor Hengelo installed the windows and curtain walls in the two residential towers and deck houses, while Hermeta Gevelbouw was responsible for the plinth building, SML1 and SML2.

Special moulds
Schüco systems were used throughout the project. Van der Sluijs says: “We used the AWS/ADS 70 HI profile series for the windows, and the FWS 50 series for the curtain wall at plinth level. Large, heavy tilt windows were included in the project to maximise transparency. Given the waterside location, where wind speeds can quickly reach force 9, this required careful coordination. But that is well within our capabilities.” Bergman adds: “The building sections for which we were responsible were also built using Schüco systems. We used the AWS/ADS 70 HI profile series for the windows too, and the FWS 60 series for the curtain wall. Special moulds were also developed for the windows to achieve the architect’s intended appearance of timber frames, while retaining all the benefits of aluminium.”

VMRG members
The entire project was developed in 3D BIM. “The project was characterised by highly insulated profiles, fire-resistant elements and specific acoustic requirements that had to be addressed,” Bergman summarises. “In short, it had just about every type of façade. But it was above all the scale that made the project special. It is a real advantage to be able to work together as two façade contractors, both VMRG members with compatible philosophies. As we found, that guarantees an exceptionally pleasant and constructive collaboration. We really did work shoulder to shoulder, sharing knowledge openly and learning from each other.” Van der Sluijs agrees, saying: “Hermeta Gevelbouw is certainly not a small player, but we are not the largest in our field either. It is great to be able to take on such a large project together without disadvantaging our other clients. We would definitely do it again.” Bergman also leaves the door open to future collaboration. “The result is impressive and something to be proud of, especially at a location that is becoming quite fashionable.”
Question about this story? Ask your question
Who worked on it
- ClientPontkade Ontwikkeling BV
- ArchitectDe Architecten Cie Amsterdam
- ContractorBouwcombinatie Pontkade VOF
- Façade contractorsAlkondor Hengelo BV, Hermeta Gevelbouw BV