VMRG | Ambitious renovation project

Van Spaendonck Ondernemingshuis (formerly Corpac Huis) in Tilburg has undergone a thorough renovation. The somewhat dated office building, dating from the late 1960s, has been completely refurbished and once again meets the requirements of a modern business centre. The new premises are a delight for architecture enthusiasts, both inside and out, and also hold a BREEAM Excellent certificate for sustainability. All in all, a highly ambitious renovation project.

Van Spaendonck Ondernemingshuis was built in the late 1960s and is ‘home’ to various divisions of the Van Spaendonck Groep, as well as a number of other organisations such as Bouwend Nederland and VNO-NCW Brabant Zeeland. The building was in urgent need of renovation, as project architect Albertien Kers of cepezed also acknowledges. “The original building was erected between 1966 and 1967 to a design by Rotterdam-based architectural practice Van den Broek en Bakema. It was a fine design in essence, with a façade featuring horizontal lines. However, the ravages of time had
clearly taken their toll on the building, making it look somewhat dated and drab. It was an unremarkable whole. The façade also no longer met building physics requirements. This prompted the client to undertake a large-scale renovation with very ambitious objectives.”

Optimal working environment
The aim of the renovation was to create an optimal working environment and level of comfort, Albertien continues. The BREEAM Excellent target also meant that all the existing technical installations were replaced. An integrated design team was therefore assembled to achieve these ambitious goals. “The redesigned façade is based on the rhythm of the original façade. We wanted to retain the horizontal lines and give the building a modern, timeless appearance. The client agreed, but stipulated that the building should stand out without being loud. The new façade has a similar solid-to-void ratio to the old one, but the new aluminium façade cladding, with its minimalist detailing, gives it a much more modern look. This is especially true in combination with the minimalist aluminium window bands and recessed top lights.”
Original building

Technical challenge
Retaining the horizontal band with its window strips and recessed top lights proved more challenging on site than on the drawing board, Albertien acknowledges. “The façade was designed to create a sleek, well-finished overall appearance. For example, the glass in the strip windows is structurally bonded and lies in exactly the same vertical plane as the external spandrel panel cladding. Both the experience and expertise of façade contractor Alhako and Schüco’s know-how played an important role in making the design technically feasible.” Henk Moonen of façade contractor Alhako agrees. “For the window strips, we combined a curtain wall with a window system, incorporating components of a unitised façade for the recessed top lights. We also added steel supports to ensure stability. It is a uniquely assembled façade package.”

Mock-up
To assess the performance and feasibility of the innovative window strips, Alhako built a mock-up in advance. “This made it clear to everyone how the construction would be realised, including all the offsets, transitions, welds and sealant joints,” says Henk. “It also allowed for some final fine-tuning and enabled the façade to be tested for wind and watertightness. For example, cepezed aimed for as little fall as possible to drain the area between the curtain wall and the recessed top lights. This also required some ingenuity. The stairwell had to meet a 30-minute fire-resistance requirement. What is remarkable is that this was achieved using glass panels measuring as much as 110 x 346 centimetres, also within an aluminium framing system. In short, for the Van Spaendonck Ondernemingshuis we pushed the limits of what the systems can accommodate in almost every respect.”
Reflections
“The surroundings are reflected in the matt-brushed façade cladding,” says Albertien. “During the preparatory phase, large sample panels were installed on the building to assess the effect, and above all to check that there would be no glare. That proved not to be the case. The cladding changes colour throughout the day. What is particularly appealing is that the biodiversity garden, an important element of the BREEAM Excellent certificate, is also reflected in the façade.” Together with the new façade rhythm, this makes Van Spaendonck Ondernemingshuis a delight for architecture enthusiasts. The same is true inside, where cepezed has opened up the existing, enclosed structure. The result has fully met the client’s expectations. “Even after a year, I often realise how fortunate we are to be able to work together in such a beautiful, sustainable building,” says Jan Gevers, Chairman of the General Management, about Van Spaendonck Ondernemingshuis, which was completely renovated in 2017.
Project details
Van Spaendonck Ondernemingshuis, Tilburg
Client
Van Spaendonck Groep
Architect
cepezed
Contractor
Mertens Bouwbedrijf
Façade contractor
Alhako Aluminiumindustrie
System supplier
Schüco Nederland
Een zakelijke vraag aan Architect at Work? Get in touch
Who worked on it
Van Spaendonck Ondernemingshuis in Tilburg, renovatie
- clientVan Spaendonck Groep
- architectcepezed
- contractorMertens Bouwbedrijf
- façade contractorAlhako Aluminiumindustrie
- System supplierSchüco Nederland
Keep following this
Get an email when a new story is published. No account needed.
- ProjectVan Spaendonck Ondernemingshuis
- ThemeExtending the life of existing facades
- SubjectVMRG
- CompanyVan Spaendonck Groep
- Companycepezed
- CompanyMertens Bouwbedrijf
- CompanyAlhako Aluminiumindustrie
- CompanySchüco Nederland