The legal aspects of the Wet kwaliteitsborging voor het bouwen (Wkb), the Quality Assurance (Building) Act, are often overlooked, even though it brings significant changes. Anyone carrying out work will face broader liability, a duty to warn about errors made by their client and the requirement to compile a handover file. This applies to every building category (1, 2 and 3) from 1 January 2024.
There are fundamental changes to liability. At present, Article 7:58 of the Dutch Civil Code governs the contractor’s liability when the work is handed over. Article 7:58(3) states that the contractor is not liable for defects that the client should reasonably have discovered at the time of handover. Liability after handover is therefore limited to latent defects. Under the law, all other defects, those the client could reasonably have discovered, are deemed to have been accepted. As a result, the contractor is exempt from liability for those defects after handover. The Quality Assurance Act adds a fourth paragraph to Article 7:58 (7:58:4). By way of derogation from paragraph 3, in contracts for construction work the contractor is liable for defects that were not discovered when the work was handed over, unless those defects are not attributable to the contractor. This paragraph cannot be derogated from to the client’s detriment if the client is a natural person (a consumer) acting outside their trade or profession. In other cases (work for businesses), this paragraph may be derogated from to the client’s detriment only if this is expressly stated in the contract. Under the new article, the contractor or subcontractor remains liable after handover for defects or construction errors that were not discovered at handover, unless they can demonstrate that the error is not attributable to them (the burden of proof is reversed). Under new paragraph 4, the only relevant question is whether a defect was discovered. If it was not, it is a defect for which the contractor is liable under Article 7:758(4) of the Dutch Civil Code (new), provided, of course, that the defect is attributable to them.
The contractor’s or subcontractor’s duty to warn the client is also being strengthened. Warnings about, for example, components that cannot be executed in compliance with statutory requirements must be given in writing and in clear terms. It is important to state what the consequences of the error will be. As a result, contractors will demand more assurances from subcontractors and suppliers. This applies to errors that you know about or should know about, such as errors in the order, drawings, calculations, plans, specifications or execution requirements, or defective or unsuitable items supplied by your client. This strengthens quality throughout the supply chain.
The requirement to provide a handover file will not come into force on 1 January 2024, but at a later date. The party carrying out the work must provide a handover file. The handover file, also known as the consumer file, is evidence that you have fulfilled your obligations. It must include at least drawings and calculations, a description of the materials and installations, a description of the intended uses, and information and documents needed for operation and maintenance. The client and contractor are free to agree whether a handover file will be provided. It is also possible not to provide one. If a file is provided, its content and format must be agreed in advance.”
The main benefit of the new act lies in a shift in quality assessment, from the construction plan to the building as actually completed. “We are moving from promised quality to delivered quality. The quality assurance provider carries out the risk assessment at the start of the process, not at the end.” The construction file to be submitted (the file for the competent authority) will therefore document the as-built situation, with up-to-date drawings and calculations.
It is important not to rely solely on the quality assurance provider for construction quality, but to establish quality assurance within your own organisation too. For our sector, the principle is: “The more preparatory work the façade contractor does, the less work the quality assurance provider has to do.” If internal quality assurance is robust, the external quality assurance provider can carry out only a minimum number of inspections. With our accredited quality system in accordance with BRL 2701 and BRL 0105, our sector is at the highest level of the Wkb ladder, so we are in good shape.